Follow the arrows from left to right. Each stage prepares the information the next stage needs.
- 01Required
Sites ready
Walk through the physical production process and match each area to a Forge record.
provides the information needed for - 02Required
Lines ready
Confirm which Line receives the first operation for every product type.
provides the information needed for - 03Required
Stations ready
Confirm Line capacities using a small realistic production quantity.
provides the information needed for - 04Required
Shifts ready
Confirm every operation and failure path has a usable Station.
provides the information needed for - 05Required
Factory model approved
This stage contributes to the outcome: Confirm the physical factory model is complete before creating production master data.
Why this connection matters: Do not compensate for missing Lines by creating extra Stations.
Step-by-step in Forge
Navigation: Manufacturing → Factory setup and Process & Engineering
- Check Sites: Open Sites and confirm every physical manufacturing location is represented.
- Check Lines: Open Line and confirm the intended first production Line has Is Starting Line enabled.
- Check capacity: Open each Line and review Task Queue Capacity, hourly capacity, and shift capacity.
- Check Stations: Open Stations and confirm every Routing operation and failure path has an active Station.
- Run a small validation: Use a small Work Order quantity to confirm the factory model can accept and route Production Tasks.
Watch the task
Watch: Factory Readiness Checklist
GIF walkthrough placeholder for Factory Readiness Checklist.
Rules to remember
- Do not compensate for missing Lines by creating extra Stations.
- Do not mark every Line as a Starting Line unless units can genuinely begin there.
- Repair Stations must be planned before Routings are built.
Ready when
- Required Sites exist.
- Lines are active, correctly typed, and have explicit capacity.
- Initial Lines are marked as Starting Lines.
- Operation and Repair Stations exist at valid Sites.
- At least one valid Shift exists.